Advertisement
AMR's MSV Mineral Reserve estimates of approximately 1.6 Mt of Proven and Probable Mineral Reserves at a cut off grade of 0.86%Ni is summarized in the following table. This estimate is consistent with the previously reported Mineral Reserves.
Table 3: Ban Phuc Project Mineral Reserve Estimate as of February 15, 2013----------------------------------------------------------------------------Item Mt Ni grade % Cu grade % Co grade %----------------------------------------------------------------------------Proven Mineral Reserves 0.7 2.4 1.0 0.06----------------------------------------------------------------------------Probable Mineral Reserves 0.9 2.1 1.0 0.04----------------------------------------------------------------------------Total Mineral Reserves 1.6 2.2 1.0 0.05----------------------------------------------------------------------------Note: See "Notes to the Mineral Reserves".
Notes to the Mineral Resources:
1. Mineral Resources that are not Mineral Reserves do not have a demonstrated economic viability.2. The stated Mineral Resources have been prepared in accordance with Canada's National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and are classified in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum's ("CIM") "CIM Definition Standards - For Mineral Resources and Mineral Reserves".3. Dr. Bielin Shi of CSA Global Pty Ltd, who is independent of AMR and is a "qualified person" within the meaning of NI 43-101 has reviewed and accepts responsibility for the stated Mineral Resource estimates. Dr. Shi consents to the inclusion in this report of the matters in this report based on the Mineral Resource estimates in the form and context in which they appear. Dr. Shi is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing or political issues what would materially affect the stated Mineral Resource estimates.4. For more detailed information regarding the Ban Phuc MSV deposit, DISS deposit, key assumptions, parameters, sampling, analytical methods, quality assurance program, geology, geological controls and mineralization see: AMR's NI 43-101 Technical Report dated February 5, 2013 (as amended February 15, 2013) (the "Technical Report") available at www.sedar.com.Notes to the Mineral Reserves:
1. The stated Mineral Reserve comprises MSV mineralization only.2. Mr. John Wyche of Australian Mine Design and Development Pty Ltd, who is independent of AMR and is a "qualified person" within the meaning of NI 43-101 has reviewed and accepts responsibility for the stated Mineral Reserve estimate. Mr. Wyche consents to the inclusion in this report of the matters in this report based on the Mineral Reserve estimate in the form and context in which it appears. Mr. Wyche is not aware of any environmental, permitting, legal, title, taxation, socio-economic, marketing or political issues what would materially affect the stated Mineral Reserve estimate.3. The stated Mineral Reserve estimate has been prepared in accordance with NI 43-101 and is classified in accordance with CIM's "CIM Definition Standards - For Mineral Resources and Mineral Reserves".4. The stated Mineral Reserve was estimated using a nickel price of US$21,310/t, copper price of US$8,419/t and cobalt price of US$34,000/t.5. The annual ore production estimate is 360,000 tpa.6. The stated Mineral Reserve estimate includes Vietnamese government royalties of 10% and export tariffs of 20% for nickel and cobalt and 30% for copper.7. For more detailed information regarding the Ban Phuc MSV deposit key assumptions, parameters, sampling, analytical methods, quality assurance program, geology, geological controls and mineralization see the Technical Report available at www.sedar.com.



