Advertisement
The first phase trenching program, oriented transverse to the prevailing structures, was designed to establish the existence of the mineralisation along strike, while attempting to define controls on its localisation. Sixteen trenches, dug to an average depth of 2.5 m and totalling 3,139 m, were sampled on zones 1 to 3. Highlights of the assay results in the trenches, where the average grade over a mineralized interval of a minimum of 3 m exceeded 7% Mn, are presented in Table 2 below.
Table 2 - Pipiani Prospect - Highlights of new trench results----------------------------------------------------------------------------Trench Target Total Length Manganese intersection Grade ------------------------------- From To Mn (area) (m) (m) (m) Length (m) (%)----------------------------------------------------------------------------TR_003PI PZ3 397.69 53 80 27 23.16--------------- ---------------------------------------TR_003PI 92 142 50 16.5--------------- ---------------------------------------TR_003PI 147 155 8 13.7--------------- ---------------------------------------TR_003PI 200 228 28 12.97--------------- ---------------------------------------TR_003PI 253 256 3 13.62----------------------------------------------------------------------------TR_004PI PZ3 353.31 218 229 11 8.27----------------------------------------------------------------------------TR_007PI PZ1 379.39 21 25 4 24.67--------------- ---------------------------------------TR_007PI 258 280 22 7.3--------------- ---------------------------------------TR_007PI 283 294 11 12.2--------------- ---------------------------------------TR_007PI 329 338 9 11.63----------------------------------------------------------------------------TR_007EXTPI PZ1 190 121 128 7 7.44----------------------------------------------------------------------------TR_008PI PZ1 273.48 75 106 31 12.79----------------------------------------------------------------------------TR_010PI PZ1 380.91 270 295 25 13.7--------------- ---------------------------------------TR_010PI 308 325 16 27.41----------------------------------------------------------------------------TR_011PI PZ1 338.05 11 23 12 14.61--------------- ---------------------------------------TR_011PI 128 148 20 9.39--------------- ---------------------------------------TR_011PI 154 165 11 9.06--------------- ---------------------------------------TR_011PI 180 224 44 14.68--------------- ---------------------------------------TR_011PI 240 276 36 25.66--------------- ---------------------------------------TR_011PI 301 307 6 9.1----------------------------------------------------------------------------TR_012PI PZ1 145 6 9 3 10.95--------------- ---------------------------------------TR_012PI 43 58 15 12.78--------------- ---------------------------------------TR_012PI 70 84 14 25.24--------------- -----------------------TR_012PI 104 120 16 16.42----------------------------------------------------------------------------TR_013PI PZ1 214.38 21 25 4 9.86--------------- ---------------------------------------TR_013PI 55 86 31 12.05----------------------------------------------------------------------------TR_014PI PZ2 83 59 83 24 16.11----------------------------------------------------------------------------TR_016PI PZ2 42 0 26 26 27.69----------------------------------------------------------------------------



