News Column

Champion Announces Preliminary Feasibility Study Results Indicating $3.3 Billion NPV and 30.9% IRR for West and East Deposits of the Consolidated Fire Lake North Project

Page 2 of 6

Champion's President and CEO, Tom Larsen commented, "Completion of this Preliminary Feasibility Study is the result of our team's dedicated efforts over the past couple of years and we believe the results confirm the excellent project at our Consolidated Fire Lake North property. The delivery of the Preliminary Feasibility Study is another major milestone for Champion. Our progress in securing port access and material handling capacity at Sept-Iles, advanced negotiations for electric power to the project and permits to start the mine construction camp has resulted in material de-risking of the Fire Lake North Project." Mr. Larsen added, "The recent increase in the estimated mineral resources at Consolidated Fire Lake North to over 2.6 billion tonnes including the Oil Can deposits creates strong support for a potential increase in annual concentrate production to 20 million tonnes with a mine life greater than 20 years. The release of this study on CFLN and what we believe to be a potential world-class mine will accelerate our discussions with potential strategic partners."

Consolidated Fire Lake North Project Mineral Reserves

The iron process recovery of 82% yields an average production of 9.3 million tonnes per year ("Mtpa") of iron concentrate grading 66% total Iron ("FeT") during a 19.6 years mine life. The current optimized engineered pits yield reserves of 464.6 M tonnes grading 32.37% FeT at a 15% FeT cut-off grade with a weight recovery of 39.9%. The first five years of production will average 9.8 Mtpa of concentrate.

Table 1 underneath summarizes the reserves and stripping estimates for both the West and East pit.

----------------------------------------------------------------------------                                   West Pit                 East Pit                          --------------------------------------------------Consolidated                           Fe        %              Fe        %Fire Lake North             Tonnage  Total   Weight  Tonnage  Total   WeightTable of Reserves              (Mt)      % Recovery     (Mt)      % Recovery----------------------------------------------------------------------------Proven Reserves                20.7   36.2     45.7      3.0   34.2     40.2----------------------------------------------------------------------------Probable Reserves             268.1   33.4     42.2    172.8   30.2     35.6----------------------------------------------------------------------------Total                         288.8   33.6     42.4    175.8   30.3     35.6----------------------------------------------------------------------------Overburden                    100.8                     19.4----------------------------------------------------------------------------Waste Rock                    616.8                    490.7----------------------------------------------------------------------------Inferred Resources (waste)     29.9                     15.9----------------------------------------------------------------------------Total of Waste Stripping      747.6                    526.0----------------------------------------------------------------------------Stripping Ratio (Waste Striping/Ore)                  2.6                      3.0----------------------------------------------------------------------------Life of Mine                      12.6 years               7.1 years--------------------------------------------------------------------------------------------------------------------------------------------------------                                          Both Pits Combined                          --------------------------------------------------Consolidated                                            Fe                %Fire Lake North                     Tonnage           Total           WeightTable of Reserves                      (Mt)               %         Recovery----------------------------------------------------------------------------Proven Reserves                        23.7            36.0             45.0----------------------------------------------------------------------------Probable Reserves                     440.9            32.2             39.6----------------------------------------------------------------------------Total                                 464.6            32.4             39.9----------------------------------------------------------------------------Overburden                            120.2----------------------------------------------------------------------------Waste Rock                          1,107.6----------------------------------------------------------------------------Inferred Resources (waste)             45.8----------------------------------------------------------------------------Total of Waste Stripping            1,273.5----------------------------------------------------------------------------Stripping Ratio (Waste Striping/Ore)                          2.7----------------------------------------------------------------------------Life of Mine                                  19.6 years----------------------------------------------------------------------------

Continued | 1 | 2 | 3 | 4 | 5 | 6 | Next >>

Story Tools