News Column

Probe Mines Announces Additional Assay Results for Its Borden Gold Project: Expansion and Infill Drilling on the Main Mineralized Zone Returning Excellent Values

Jan 8 2013 12:00AM

Marketwire

LogoTracker

TORONTO, ONTARIO -- (Marketwire) -- 01/08/13 -- Probe Mines Limited (TSX VENTURE: PRB) ("Probe" or the "Company") is pleased to announce that it has received further assays from its ongoing drilling program at the Company's Borden Gold project near Chapleau, Ontario. Results for diamond drill holes BL12-297 to BL12-313 were received and continue to expand the gold zone to depth, identify new mineralization to the hanging wall side (northeast) of the main zone and confirm the main zone through infill drilling. Although a number of intervals are of higher grade mineralization, these holes are not in the area of the recent high-grade discovery. The high-grade mineralization will be the focus of follow-up drilling when the program recommences in early January. The drilling up to, and including, Hole BL12-313 will all be part of an updated NI 43-101 compliant Resource Estimate to be released shortly.

Of the seventeen (17) new holes, four (4) represent expansion of the main zone mineralization to depth; two (2) represent drilling in the immediate hanging wall of the main zone testing for parallel gold zones; and the remaining eleven (11) were drilled as infill to previous drilling of the main zone.

Results continue to show a consistent overall improvement in grades with all but one of the intersections reported here returning values at or above the 0.6 g/t gold ("Au") cut-off used to define the Updated Resource (see news release dated April 2, 2012). A significant number of intersections also display average grades over 1.5 g/t suggesting that the higher-grade core zone is also improving. Notable intervals include 41.7 metres grading 1.6 g/t Au in Hole BL12-300 (Section 350m SE) and a 35-metre intercept averaging 1.9 g/t Au in Hole BL12-309 (Section 550m SE), which includes a 14.5 metre wide interval averaging 3.3 g/t Au.

The Hanging Wall drilling program remains successful in delineating gold mineralization above the main deposit to the northeast, with Hole BL12-298 (Section 650m NW) containing a number of gold-bearing intervals at shallow depths. Further drilling will be required in 2013 to better evaluate the gold zones identified during the 2012 program.

The following tables show selected results from Depth Extension, Hanging Wall and Infill drilling programs. For the majority of holes, drill width approximates true width. For holes BL12-304-306 and -312 true width is approximately 90% of drilled width.

Updated plan and section maps are available on the Company's website at www.probemines.com.

Depth Extension Drilling

----------------------------------------------------------------------------                                       From         To      Width         AuDDH                      Section        (m)        (m)        (m)      (g/t)----------------------------------------------------------------------------BL12-303                 900m SE      364.8      370.1        5.3        6.4----------------------------------------------------------------------------BL12-303                              378.3        387        8.7        0.9----------------------------------------------------------------------------BL12-303                                407        448         41        1.1----------------------------------------------------------------------------including                               411        417          6        2.7----------------------------------------------------------------------------BL12-305                 900m SE        426        432          6        1.8----------------------------------------------------------------------------BL12-305                                438        451         13        2.5----------------------------------------------------------------------------BL12-308                 800m SE      379.2        417       37.8        1.0----------------------------------------------------------------------------BL12-313                 800m SE        319        342         23        1.3----------------------------------------------------------------------------including                             320.7        327        6.3        2.4----------------------------------------------------------------------------BL12-313                              369.4        380       10.6        1.4----------------------------------------------------------------------------BL12-313                                384      404.5       20.5        0.8----------------------------------------------------------------------------

Continued | 1 | 2 | 3 | Next >>

Story Tools