News Column

IMPACT Silver Corp.'s Mirasol Prospect Uncovers a Cluster of New Silver Veins; Intersections Include 945 Grams-Per-Tonne-Silver Over 1.8 Meters

Jan 28 2013 12:00AM

Marketwire

LogoTracker

VANCOUVER, BRITISH COLUMBIA -- (Marketwire) -- 01/28/13 -- IMPACT Silver Corp. ("IMPACT" or "the Company") (TSX VENTURE: IPT) announces results from the second phase drill program on the recently discovered Mirasol Prospect, located 5.5 kilometers southeast of IMPACT'S 500-tonne-per-day (tpd) Guadalupe processing plant at the Royal Mines of Zacualpan Silver-Gold District in central Mexico. Higher grade silver values are now being encountered, as well as the discovery of several new veins. A highlight from this program includes drill hole Z12-79, which encountered seven distinct veins, all of which are now contributing potentially economic silver intersections. For the first time since the Company began its exploration drilling in 2006, the top of a new silver bearing vein has been discovered in the district with the expectation that the entire mineralized system is preserved at depth.

IMPACT announced intersections of 8.94 meters of 183 g/t silver and 12.25 meters of 112 g/t silver from the first phase drill program at Mirasol (see news release dated November 26, 2012). This second phase drill program has continued to expand mineralization of the Mirasol Central Zone along strike and at depth. Summarized below are the significant intersections from this second phase of drilling:

Mirasol Central Drilling Area Significant Intersections - Second Phase Drill Program

                                                                        TRUEHOLE              DRILL                       FROM      TO  INTERVAL   WIDTHNUMBER          SECTION   VEIN NAME         meters  meters    meters  meters----------------------------------------------------------------------------Z12-79         L04+00 S   Mirasol Arriba 4  111.22  113.36      2.14    2.13and            L04+00 S   Mirasol Arriba 3  127.25  128.40      1.15    1.14and            L04+00 S   Mirasol Arriba 2  157.15  158.60      1.45    1.45and            L04+00 S   Mirasol Arriba 1  162.60  164.48      1.88    1.88and            L04+00 S   Mirasol           170.00  173.00      3.00    3.00and            L04+00 S   El Deshuesadero   193.44  194.18      0.74    0.63including      L04+00 S   El Deshuesadero   193.74  194.18      0.44    0.40and            L04+00 S   El Deshuesadero                           Abajo 1          201.18  203.72      2.54    2.34----------------------------------------------------------------------------Z12-80         L02+50 S   El Deshuesadero    83.45   85.15      1.70    1.55and            L02+50 S   Mirasol            90.80   91.30      0.50    0.49----------------------------------------------------------------------------Z12-81         L02+50 S   Mirasol           101.00  108.00      7.00    6.98and            L02+50 S   El Deshuesadero   122.00  122.52      0.52    0.47and            L02+50 S   El Deshuesadero                           Abajo 1          132.13  133.00      0.87    0.78----------------------------------------------------------------------------Z12-82         L04+00 S   Valentina          85.40   90.00      4.60    2.01and            L04+00 S   El Cabus          103.10  103.90      0.80    0.47and            L04+00 S   Mirasol Ariiba 3  150.70  151.68      0.98    0.97and            L04+00 S   Mirasol           188.75  190.55      1.80    1.79including      L04+00 S   Mirasol           189.90  190.55      0.65    0.64----------------------------------------------------------------------------Z12-83         L04+00 S   Mirasol           200.65  203.00      2.35    2.35and            L04+00 S   Mirasol A         205.00  208.00      3.00    2.97and            L04+00 S   New Vein          358.40  358.60      0.20    0.18----------------------------------------------------------------------------Z12-84         L04+00 S   Mirasol           214.65   216.0      1.35    1.33and            L04+00 S   Mirasol A         219.20  219.80      0.60    0.54----------------------------------------------------------------------------Z12-85         L04+50 S   Mirasol Arriba 3  114.65  116.00      1.35    1.11including      L04+50 S   Mirasol Arriba 3  114.65  115.65      1.00    0.95and            L04+50 S   Mirasol           147.15  148.26      1.11    1.11including      L04+50 S   Mirasol            147.6  148.26      0.66    0.66and            L04+50 S   El Deshuesadero   178.70  179.65      0.95    0.81including      L04+50 S   El Deshuesadero   179.30  179.65      0.35    0.31----------------------------------------------------------------------------Z12-86         L04+50 S   Mirasol           176.56  177.60      1.04    1.04and            L04+50 S   El Deshuesadero   217.25  220.70      3.45    3.20including      L04+50 S   El Deshuesadero   218.60  219.00      0.40    0.38and            L04+50 S   El Deshuesadero                           Abajo 1          230.25  231.10      0.85    0.75----------------------------------------------------------------------------HOLE              DRILL                     SILVER    GOLD      LEAD    ZINCNUMBER          SECTION   VEIN NAME            g/t     g/t         %       %----------------------------------------------------------------------------Z12-79         L04+00 S   Mirasol Arriba 4   119.0   0.014      0.07    0.18and            L04+00 S   Mirasol Arriba 3   399.9   0.034      0.13    0.08and            L04+00 S   Mirasol Arriba 2   143.0   0.024      0.03    0.10and            L04+00 S   Mirasol Arriba 1   529.3   0.283      0.37    1.31and            L04+00 S   Mirasol            138.8   0.124      0.14    0.40and            L04+00 S   El Deshuesadero    787.8   0.181      0.45    0.58including      L04+00 S   El Deshuesadero  1,310.0   0.290      0.73    0.92and            L04+00 S   El Deshuesadero                           Abajo 1           109.2   0.039      0.25    0.90----------------------------------------------------------------------------Z12-80         L02+50 S   El Deshuesadero    931.0   0.300      1.03    2.10and            L02+50 S   Mirasol            237.0   0.040      0.11    0.22----------------------------------------------------------------------------Z12-81         L02+50 S   Mirasol            129.8   0.043      0.09    0.18and            L02+50 S   El Deshuesadero    433.0   0.070      0.39    1.14and            L02+50 S   El Deshuesadero                           Abajo 1           100.0   0.210      0.26    0.98----------------------------------------------------------------------------Z12-82         L04+00 S   Valentina          133.4   0.022      0.08    0.15and            L04+00 S   El Cabus           573.0   0.070      0.31    0.12and            L04+00 S   Mirasol Ariiba 3   227.0   0.010      0.12    0.07and            L04+00 S   Mirasol            945.6   0.893      1.51    3.43including      L04+00 S   Mirasol          2,270.0   2.420      4.15    9.42----------------------------------------------------------------------------Z12-83         L04+00 S   Mirasol            156.9   0.359      0.60    1.13and            L04+00 S   Mirasol A          193.5   0.096      0.12    0.01and            L04+00 S   New Vein           223.0   0.010      0.06    0.02----------------------------------------------------------------------------Z12-84         L04+00 S   Mirasol            312.2   0.856      5.30    3.83and            L04+00 S   Mirasol A          123.0   0.660      0.50    0.25----------------------------------------------------------------------------Z12-85         L04+50 S   Mirasol Arriba 3   792.3   0.143      0.48    0.16including      L04+50 S   Mirasol Arriba 3 1,090.0     0.2      0.66    0.18and            L04+50 S   Mirasol          1,064.2   0.187      0.46    2.05including      L04+50 S   Mirasol          1,560.0    0.28      0.65    3.04and            L04+50 S   El Deshuesadero    663.3   0.043      0.50    0.70including      L04+50 S   El Deshuesadero  1,520.0     0.1      1.18    1.73----------------------------------------------------------------------------Z12-86         L04+50 S   Mirasol            337.4   0.023      0.15    0.76and            L04+50 S   El Deshuesadero    288.7   0.090      0.14    0.51including      L04+50 S   El Deshuesadero  1,000.0   0.290      0.35    1.03and            L04+50 S   El Deshuesadero                           Abajo 1           137.0   0.030      0.06    0.19----------------------------------------------------------------------------

Continued | 1 | 2 | Next >>

Story Tools